BUILDING PRICE BUILDING QUOTATION QUOTATION.
– Standard package: 5,500,000 / m2 of construction for TOWN HOUSE (APPLICABLE FROM 20/5/2019)
– Standard package: VND 6,200,000 / m2 for VILLAS, OFFICE OFFICE WITH SCALE
THE COMPANY ONLY USES THE STANDARD PACKAGE
IF THE CUSTOMER WANT TO SAVE THE FUND, PLEASE CHOOSE THE PERSONAL CONTRACT PACKAGE
IF CUSTOMER REQUESTS A HIGH-GRADE PACKAGE, PLEASE CONTACT THE DIRECTOR TO GET A DETAILED CONSULTANT
CONDITIONS FOR APPLICATION FOR STANDARD PACKAGES – LOOKING FOR THE HANDLING:
Town house with a facade, a place to gather supplies (materials transported by trucks 5m3, fresh concrete cars endless works).
• Having floor area> 60m2, total construction area> 300 m2.
Price includes:
– Free construction design documents and construction permits.
– Commitment does not arise during construction.
– The above price is exclusive of VAT (10% VAT).
The above unit price applied to new construction works does not apply to repair and upgrade houses.
MATERIALS OF PERFECT USE:
The finished parts below are standard VICKHOME packages, in case the Owner selects other equivalent materials, we will deduct or add the difference cost (if any).
STT | WORK CONTENT | MATERIAL DESCRIPTION | MASS | UNIT PRICE VND) |
SLIP-TAPER BRICKS | ||||
1 | Floor tiles | DONG TAM 600×600 bricks (Owner selects sample) | According to TK | 250.000/m2 |
2 | Brick on the terrace, the ground in front of the ground floor | 400×400 sandpaper or equivalent price. (Owner selects sample) | According to TK | 130.000/m2 |
3 | WC floor tiles | Dong Tam emery 300×300 or price equivalent. (Owner selects sample) | According to TK | 160.000/m2 |
4 | WC wall tiles | Dong Tam Brick 300×600 or price equivalent. (Owner selects sample) | 2.4m high | 160.000/m2 |
5 | WC wall tiles (1 border line) |
Investor selects sample. | According to TK | 7,000 / tablet |
6 | Kitchen wall tiles | Dong Tam Brick 300×600 or price equivalent. (Owner selects sample) | High 1.5 | 180.000/m2 |
7 | Interior stone includes kitchen and stairs | Owner selects any sample | According to TK + Reality | 600.000/m2 |
PAINT PART | ||||
1 | Paint foreign houses | DULUX ICI water paint, JOTON plaster powder | According to TK | |
2 | Paint the water in the house | DULUX ICI water paint, JOTON plaster powder | According to TK | |
DOOR PART | ||||
1 | The door to the bedroom | XINGFA doors, toughened glass (including lock + accessories). | According to TK | 2.200.000/m2 |
2 | WC door | XINGFA doors, toughened glass (including lock + accessories). | According to TK | 1.800.000/m2 |
3 | Door to the terrace | XINGFA doors, toughened glass (including lock + accessories). | According to TK | 2.200.000/m2 |
4 | Gate | Iron door with zinc front, oil paint. | 1.200.000/m2 | |
PART OF CERAMIC BRIDGE | ||||
1 | Stone GRANITE stairs, wool stair | Owner selects samples | According to TK | 600.000/m2 |
2 | Railing + handrails for stairs | Painted iron + wooden handrails. | According to TK | 900.000/m |
KITCHEN PART | ||||
1 | Stone GRANITE kitchen surface and door | Owner selects samples | According to TK | 600.000/m2 |
2 | Sink faucet (hot and cold) | CĐT Sampling. | 1 | 1.600.000/bộ |
3 | Sink | CĐT Sampling. | 1 | CĐT buying |
CLEANING EQUIPMENT AND WATER EQUIPMENT | ||||
1 | Toilet | TOTO or equivalent. (Owner selects sample) | SL: According to TK | 2.500.000/cái |
2 | Lavabo + exhaust | TOTO or equivalent. (Owner selects sample) | SL: According to TK | 1.000.000/bộ |
3 | Hot and cold lavabo faucet | TOTO or equivalent. (Owner selects sample) | SL: According to TK | 950.000/bộ |
4 | Shower (hot and cold) | TOTO or equivalent. (Owner selects sample) | SL: According to TK | 1.600.000/bộ |
5 | Shelf + Mirror | PEACE or equivalent. Or equivalent. (Owner selects sample) | SL: According to TK | 200.000/bộ |
6 | Stainless steel water tank | DAI THANH (1000 liters, standing) | 01 | 3.000.000/bộ |
ELECTRIC EQUIPMENT – REFRIGERATION SYSTEM, HOT WATER | ||||
1 | MCB, Switch, Socket | PANASONIC or equivalent. | According to TK | Tùy thiết bị |
2 | Telephone socket, Internet, Cable TV | PANASONIC or equivalent. | According to TK | Tùy thiết bị |
3 | LED light cans decorated in the room | 9w LED light. | According to TK | 70,000/bộ |
4 | Electronic ceiling light | LED wire. | According to TK | Led 5050 |
5 | Toilet lights | 15x15cm tray lamp | According to TK | 200,000 bộ |
6 | Stair wall decoration lights, night lights | Stair wall decoration lights, night lights | According to TK | 200,000 bộ |
OTHER CATEGORY | ||||
1 | Gypsum (recoil ceiling) | WALLPAPER FRAME, GYPROC sheet. | According to TK | 135.000/m2 |
2 | Balcony railing + terrace | INOX 304 leaked. | 800.000/m | |
3 | The umbrella lit the staircase | Box 20x40x1mm, DULUX oil paint, 10 glass toughened glass roofing sheet. | According to TK | |
4 | Locks for rooms and bancon doors | CĐT Sampling. | According to TK | CĐT buying |
5 | Wc door locks | CĐT Sampling | According to TK | CĐT buying |
6 | Air conditioning copper pipe | CĐT Self-installing and waiting for installation. | According to TK | CĐT buying |
30-year structural warranty, waterproofing for 5 years.
Note:
– The above table of supplies is only basic materials, the investor needs direct contact details or call the hotline to refer to the model contract.
– In the construction process, if the above-mentioned materials are scarce and fail to meet the quality standards according to the technical requirements or are no longer produced in the market, or the supply is no longer available, or the need for replacement materials. Other materials to improve product quality, the two parties agreed to use other materials of equivalent or higher quality to ensure standards in design and aesthetics.
– The change of materials must not reduce the quality of the construction and he will enjoy the cost of both parties.